24/7 emergency · Drain jetting & unblocking every day · 07814 882512

Home / Treatment plant & septic tank installs

Package treatment plant & septic tank installation

New sewage treatment plants and septic tank replacements for off-mains homes around York, Selby, Pocklington and the East Riding. A site visit and a detailed written quote before any digging. Jamie on the job from start to finish.

In short

Tanks & Drains supplies and installs package (small) sewage treatment plants and replacement septic tank systems across York, North Yorkshire and the East Riding, from our base at Buttercrambe, York YO41 1XU. We visit, check where your system discharges against the Environment Agency’s General Binding Rules, and give you a detailed written quote before work starts. We empty the old tank with our own tanker. Call Jamie on 07814 882512.

What we install

Treatment plants, septic tanks and the bits around them

  • Package sewage treatment plants (also called small sewage treatment plants), for homes that need to discharge to a stream or river, or where a drainage field will not work.
  • Septic tank replacement with a drainage field, where the ground can take it.
  • Pump chambers where the levels mean the water has to be pumped. We also service pump chambers.
  • The old system: we empty it with our own tanker before the swap, and the quote says what happens to the old tank.

When you are likely to need a treatment plant

  • Your septic tank discharges to a ditch, stream or river. Under the General Binding Rules a septic tank must not discharge to a watercourse.
  • The ground is too wet or too slow-draining for a drainage field, and there is a watercourse that flows all year.
  • The old plant or tank has failed, or you are selling and the buyer’s survey has flagged it.

Not sure which you have? A CCTV drain survey shows where the pipes go. Our free guide explains septic tank or treatment plant side by side.

How an install works

  1. Phone call. Tell Jamie your village, how many people live in the house, and send a photo of the existing tank if you have one.
  2. Site visit. We look at where the system discharges, the ground, the falls, access for a digger and the tanker, and where power can come from.
  3. Written quote. It names the plant, the discharge route, the groundworks, the electrical connection and what is included, so there are no surprise extras dressed up as “provisional”.
  4. Approvals. A new or replacement system usually needs Building Regulations approval from the council. Some sites need a percolation test for a drainage field. We tell you what applies to your job.
  5. Install. We empty the old tank, dig, set the new plant, connect it, and reinstate the ground.
  6. Handover. You keep the manual and the service and emptying schedule. Keep the paperwork: you will need it if you sell.

The General Binding Rules, briefly

In England you do not need a permit for a septic tank or small treatment plant if you meet every General Binding Rule that applies to you. The main points: only domestic sewage; no pollution; the right system for where it discharges; a system that meets the British Standard in force when it was installed (BS EN 12566); maintenance by someone competent; and emptying at least once a year or as the manufacturer says, by a registered waste carrier. A discharge to ground may be up to 2 cubic metres a day and a discharge to surface water up to 5 cubic metres a day.

We are not solicitors and we will not pretend to be. The official wording is on GOV.UK for discharges to the ground and discharges to surface water. We have also written a local page: Binding Rules for septic tanks and treatment plants. Our team’s fuller plain-English guide is at septicguide.co.uk, along with who pays to upgrade a non-compliant septic tank.

Where we install

From Buttercrambe we cover York, Stamford Bridge, Pocklington and Market Weighton, Malton, Selby, Cliffe, Howden and Goole, Tadcaster, Easingwold, Driffield, Beverley and Pickering, and the villages in between. See all areas we cover.

After the install we can look after it: emptying at £285 (no VAT) for up to 3,000 litres within 60 minutes' drive of Buttercrambe (call for a quote if you are further out), and pump servicing.

Want a quote?

Call 07814 882512 or email hello@tanksndrains.com with your village, a photo of the existing tank if you have one, and roughly how many people live in the house.

★★★★★
“Jamie recently installed a new treatment tank for us. From start to finish the service was impeccable. A good detailed quote at the start…”
Gemma ChapmanGoogle review
Treatment plant chamber riser and orange pipe in a garden trench
Plant in the ground
Finished treatment plant covers with air pumps mounted on green lids
Finished covers
New drain run laid in a garden trench
New pipe run

Questions about treatment plant and septic tank installs

Do I need a treatment plant or a septic tank?

It depends where the treated water goes. A septic tank may only discharge to the ground through a drainage field that meets British Standards. If the only practical outlet is a river or stream that flows all year, you need a small sewage treatment plant. Ground conditions, space and power on site also matter. Jamie checks this on the site visit.

My septic tank goes into a ditch or stream. What do I have to do?

Under the Environment Agency’s General Binding Rules a septic tank must not discharge to a watercourse. GOV.UK gives three options: connect to a public foul sewer, replace the tank with a small sewage treatment plant, or install a drainage field so it discharges to ground. The original deadline was 1 January 2020. Read the rules on GOV.UK.

Do I need a permit for a new treatment plant?

Not if the system meets every General Binding Rule that applies to it. That includes using a plant that meets the British Standard (BS EN 12566), keeping within the volume limits (2 cubic metres a day to ground, 5 to surface water) and getting it maintained and emptied. If the rules cannot be met, you connect to the sewer, change the design, or apply to the Environment Agency for a permit. A new or replacement system usually also needs Building Regulations approval from the council, and we cover what applies to your job in the quote.

How much does a treatment plant install cost?

We do not publish a single price because the plant size, the ground, access for a digger, the distance to the outlet and the electrics all change the job. You get a detailed written quote after the site visit, setting out the plant, the discharge route, the groundworks, the electrical connection and what is included.

Does a treatment plant need electricity and emptying?

Most do need power, for example to run an air blower or pump, so the supply is part of the quote. Both septic tanks and treatment plants need emptying: GOV.UK says at least once a year or in line with the manufacturer’s instructions, by a registered waste carrier. We do the emptying with our own tanker.

Do you install treatment plants in Selby and Cliffe?

Yes. Selby, Cliffe, Hemingbrough and North Duffield are roughly 35 to 40 minutes from our base at Buttercrambe. See septic tanks and treatment plants in Selby, Cliffe and Goole.

Which other areas do you cover for installs?

York, Stamford Bridge, Pocklington, Market Weighton, Malton, Tadcaster, Easingwold, Driffield, Beverley, Pickering, Howden and Goole, and the villages in between. Further out, ask and we will tell you straight.